France – Nice – 2014

Maeterlinck Palace Inclined Elevator

The Maeterlinck Palace is a former luxury hotel overlooking the Bay of Angels in Nice. In 2014, it was equipped with an inclined elevator to allow its residents to easily reach the beach.

product range
Inclined Elevator
Application
Site access
More About

The Project

The Maeterlinck Palace, bought up in June 2012, has been transformed into a luxury residence of eighteen apartments. The inclined elevator takes its passengers to the private beach quickly and easily.

Technical 

Specifications

Longueur

Length

63 m

Incline

33°

Date

Speed

1,6 m/s

Number of people per carrier

6

nombre de stations

Number of stations

2

Maeterlinck Palace in pictures

More

POMA Special Projects

View all

Enshi Grand Canyon Funicular

China – Enshi – 2020

In the Enshi Grand Canyon, one of the most well-known tourist parks in China, POMA has built a funicular railway to open up a natural area with many hiking paths to tourists.

Read

Mokpo

South Korea – Mokpo – 2019

With the Mokpo tourist gondola lift, POMA produced its longest ever span of rope between two towers and boasts the highest cement tower ever built for a monocable ropeway anywhere in the world. A breathtaking journey!

Read

Beauval

France – Beauval – 2019

With the “Nuage de Beauval” (literally, the Cloud of Beauval”), Beauval and POMA combined their expertise to design and build a gondola lift that is one of a kind in France. The gondola lift connects the panda and elephant areas to the lion kingdom in just a few minutes. In addition to being a great…

Read

Maokong

Taiwan – Taipei – 2006

The Maokong gondola lift is located in a historic area of the Taiwanese capital, connecting Taipei Zoo and Maokong. It is one of the largest in the world, spanning four kilometres. Ensuring the synchronisation of its 5 sections and the interconnection of its 6 stations constituted a true technological challenge.

Read

Tlemcen

Algeria – Tlemcen – 2018

The Tlemcen gondola lift that connects the city centre to the Lalla Setti Plateau had been at a standstill for four years when it resumed service in 2018. The arrival of the gondola lift was the source of great hope, as it represents a means of transport with high added value for Tlemcen, the ultimate…

Read

Vin Pearl

Vietnam – Nha Trang – 2006

In Vietnam, the famous POMA gondola lift from Vin Pearl flies over the sea to reach an island and its luxury resort.

Read

Zacatecas

Mexico – Zacatecas – 2018

The new POMA detachable gondola lift in Zacatecas takes passengers on a stunning journey over the historic centre of this ancient Mexican city, in one of the seven emblematic red cabins.

Read

Zhuhai

China – Zhuhai – ongoing project

In China, POMA has built the world’s first three interconnected tri-cable ropeways system (3S) for the Chimelong Group, the world’s 6th largest entertainment group.

Read

Galala city

Egypt – Galala City – 2018

The tourist gondola lift of the new town of Galala City links the urban area to the luxurious seaside resort, travelling the longest stretch in the Middle East. Its glass-floored cabins offer an exceptional journey with a unique view of the superb desert landscapes that border the Red Sea.

Read

Yen TU

Vietnam – Yen Tu – 2017

The Buddhist temples of the sacred mountain of Yen Tu welcome many pilgrims and tourists. In 2017, two new gondola lifts were built, including New Yen Tu 1, which complements the mobility offer by doubling the Yen Tu 1 gondola lift.

Read

Huashan

China – Huashan (Shaanxi) – 2012

POMA designed Shaanxi Taihua Tourism Ropeway Road, a gondola lift that transports tourists and pilgrims to the top of Mount Huashan, 2,120 metres away in the heart of China’s central Shaanxi province.

Read

France – Nice – 2014

Maeterlinck Palace Inclined Elevator

The Maeterlinck Palace is a former luxury hotel overlooking the Bay of Angels in Nice. In 2014, it was equipped with an inclined elevator to allow its residents to easily reach the beach.

product range
Detachable chairlift
Application
Domaine Skiable
More About

The Project

The Maeterlinck Palace, bought up in June 2012, has been transformed into a luxury residence of eighteen apartments. The inclined elevator takes its passengers to the private beach quickly and easily.

Technical 

Specifications

Longueur

Length

63 m

Incline

33°

Date

Speed

1,6 m/s

Number of people per carrier

6

nombre de stations

Number of stations

2

POMA, l’innovation

au service du projet

Montée et Descente

Le télésiège de la Repose est exploité à la montée depuis le front de neige mais peut aussi embarquer des passagers à la descente lorsque les pistes de retour station sont fermées ou que l’enneigement est insuffisant.

 

Facilité d’embarquement

 

 

Le télésiège de la Repose dessert un important secteur débutants réputées pour ses pistes faciles ; sa facilité d’embarquement séduit les skieurs les plus inexpérimentés.

Téléski

En 2013  POMA a aussi réalisés le téléski des Mélèzes, accessible depuis le plateau de la Repose, contribuant ainsi à développer le secteur de la Repose.

Faible impact visuel

La nouvelle couverture basse en bois a permis d’améliorer grandement l’intégration de la gare dans le paysage de la station.

Confort des sièges

 

Le télésiège de la Repose est équipé de sièges 4 places avec repose-pieds individuels sur les garde-corps et de bacs à l’arrière des sièges pour stocker skis et planche de snowboard lorsque le télésiège est exploité à la descente.

Maeterlinck Palace in pictures

More

POMA Special Projects

View all

American Eagle

United States – Copper Mountain, Colorado – 2018

How the west was won: the American Eagle is the first TELEMIX® ropeway installed in the United States by the POMA Group. Passengers settle into one of the six-seater chairs and eight-seater gondolas to reach the top of the slopes or the high-altitude restaurant.

Read

Grangettes

France – Courchevel – 2018

The Les 3 Vallées company entrusted POMA with the construction of the new emblematic gondola lift of Les Grangettes. A true link between Courchevel Village and Courchevel 1850, the gondola lift is operated every day until 11 pm. It is a busy link and has opened the door to peri-urban rope transport in the mountains.

Read

Arkhyz

Russia – Arkhyz – 2018

Northern Caucasus Resort is continuing its development project, which began in 2011 in the Caucasus mountains, and has an impressive 10-seat 3.8 km gondola lift with 3 sections on its north slope.

Read

Meihuashan

Meihuashan Lift-1 et 2

In China, the Meihuashan gondola lift is a valley elevator at the heart of a year-round tourism project

Read

Treeline Cirque

United States – Squaw Valley / Alpine Meadows (California) – 2019

Leitner Poma of America, a long-standing partner of the Alpine Meadows ski resort, replaced the 1996 Hot Wheels fixed-grip chairlift this year with a new higher-performance 4-seater detachable chairlift, and took the opportunity to improve the route.

Read

Skyvall

France – Loudenvielle Peyragudes – 2019

The “Skyvall” gondola lift is a link between the village of Loudenvielle, with its lake and its recreational spa, and the ski resort of Peyragudes. Since the summer of 2020, it has helped improve the year-round appeal of this beautiful valley in the Pyrenees.

Read

Ski Indoor Dubaï

United Arab Emirates – Dubai – 2005

The Souk Al Nakheel fixed chairlift is the main installation of Ski Dubai, the first indoor ski centre of its kind in the Persian Gulf region, and the most famous in the world.

Read

Cuiyunshan

China – Cuiyunshan – 2017

A superb 6/8 Telemix®, combining 6-seater chairs with protective hoods and 8-person Diamond cabins, was deployed in Cuiyunshan, a new station near Chongli, four hours by road from Beijing.

Read

Diablerets Express

Switzerland – Diablerets – 2018

In French-speaking Switzerland, customer and operator comfort was the primary focus of the Diablerets station restructuring project. The eponymous gondola lift therefore replaces a chairlift to enhance skier comfort, and is equipped with a SmartBoard control console to ensure optimum operator comfort.

Read

Vanoise Express

France – La Plagne (Savoie) – 2003

The emblematic ropeway of the Vanoise Massif mountain range gave rise to the vast Paradiski skiing area in 2003. It held the record as the biggest cabin in the world until 2016.

Read

American Flyer

United States – Copper Mountain (Colorado) – 2018

The American Flyer may be the world’s longest bubble chairlift; in any case, it is the longest one manufactured by the POMA Group on American soil.

Read

France – Nice – 2014

Maeterlinck Palace Inclined Elevator

The Maeterlinck Palace is a former luxury hotel overlooking the Bay of Angels in Nice. In 2014, it was equipped with an inclined elevator to allow its residents to easily reach the beach.

product range
TELEMIX®
Application
Skiing Area
More About

The Project

The Maeterlinck Palace, bought up in June 2012, has been transformed into a luxury residence of eighteen apartments. The inclined elevator takes its passengers to the private beach quickly and easily.

Télémix® Les Jeux

in motion

Technical 

Specifications

Longueur

Length

63 m

Incline

33°

Date

Speed

1,6 m/s

Number of people per carrier

6

nombre de stations

Number of stations

2

POMA, l’innovation

au service du projet

Montée et Descente

Le télésiège de la Repose est exploité à la montée depuis le front de neige mais peut aussi embarquer des passagers à la descente lorsque les pistes de retour station sont fermées ou que l’enneigement est insuffisant.

 

Facilité d’embarquement

 

 

Le télésiège de la Repose dessert un important secteur débutants réputées pour ses pistes faciles ; sa facilité d’embarquement séduit les skieurs les plus inexpérimentés.

Téléski

En 2013  POMA a aussi réalisés le téléski des Mélèzes, accessible depuis le plateau de la Repose, contribuant ainsi à développer le secteur de la Repose.

Faible impact visuel

La nouvelle couverture basse en bois a permis d’améliorer grandement l’intégration de la gare dans le paysage de la station.

Confort des sièges

 

Le télésiège de la Repose est équipé de sièges 4 places avec repose-pieds individuels sur les garde-corps et de bacs à l’arrière des sièges pour stocker skis et planche de snowboard lorsque le télésiège est exploité à la descente.

Maeterlinck Palace in pictures

They talk about it

Télémix® les jeux

A remarkable system that combines very high capacity, comfort, availability and ease of operation. Developed with constant and productive dialogue with SATA, this TELEMIX® is a wholly innovative system for both the passengers and the operator.

Directeur Projets and Supply Chain POMA.

Philippe LAVILLE
More

POMA Special Projects

View all

American Eagle

United States – Copper Mountain, Colorado – 2018

How the west was won: the American Eagle is the first TELEMIX® ropeway installed in the United States by the POMA Group. Passengers settle into one of the six-seater chairs and eight-seater gondolas to reach the top of the slopes or the high-altitude restaurant.

Read

Grangettes

France – Courchevel – 2018

The Les 3 Vallées company entrusted POMA with the construction of the new emblematic gondola lift of Les Grangettes. A true link between Courchevel Village and Courchevel 1850, the gondola lift is operated every day until 11 pm. It is a busy link and has opened the door to peri-urban rope transport in the mountains.

Read

Arkhyz

Russia – Arkhyz – 2018

Northern Caucasus Resort is continuing its development project, which began in 2011 in the Caucasus mountains, and has an impressive 10-seat 3.8 km gondola lift with 3 sections on its north slope.

Read

Meihuashan

Meihuashan Lift-1 et 2

In China, the Meihuashan gondola lift is a valley elevator at the heart of a year-round tourism project

Read

Treeline Cirque

United States – Squaw Valley / Alpine Meadows (California) – 2019

Leitner Poma of America, a long-standing partner of the Alpine Meadows ski resort, replaced the 1996 Hot Wheels fixed-grip chairlift this year with a new higher-performance 4-seater detachable chairlift, and took the opportunity to improve the route.

Read

Skyvall

France – Loudenvielle Peyragudes – 2019

The “Skyvall” gondola lift is a link between the village of Loudenvielle, with its lake and its recreational spa, and the ski resort of Peyragudes. Since the summer of 2020, it has helped improve the year-round appeal of this beautiful valley in the Pyrenees.

Read

Ski Indoor Dubaï

United Arab Emirates – Dubai – 2005

The Souk Al Nakheel fixed chairlift is the main installation of Ski Dubai, the first indoor ski centre of its kind in the Persian Gulf region, and the most famous in the world.

Read

Cuiyunshan

China – Cuiyunshan – 2017

A superb 6/8 Telemix®, combining 6-seater chairs with protective hoods and 8-person Diamond cabins, was deployed in Cuiyunshan, a new station near Chongli, four hours by road from Beijing.

Read

Diablerets Express

Switzerland – Diablerets – 2018

In French-speaking Switzerland, customer and operator comfort was the primary focus of the Diablerets station restructuring project. The eponymous gondola lift therefore replaces a chairlift to enhance skier comfort, and is equipped with a SmartBoard control console to ensure optimum operator comfort.

Read

Vanoise Express

France – La Plagne (Savoie) – 2003

The emblematic ropeway of the Vanoise Massif mountain range gave rise to the vast Paradiski skiing area in 2003. It held the record as the biggest cabin in the world until 2016.

Read

American Flyer

United States – Copper Mountain (Colorado) – 2018

The American Flyer may be the world’s longest bubble chairlift; in any case, it is the longest one manufactured by the POMA Group on American soil.

Read

France – Nice – 2014

Maeterlinck Palace Inclined Elevator

The Maeterlinck Palace is a former luxury hotel overlooking the Bay of Angels in Nice. In 2014, it was equipped with an inclined elevator to allow its residents to easily reach the beach.

product range
Material Ropeways
Application
Bulk Material
More About

The Project

The Maeterlinck Palace, bought up in June 2012, has been transformed into a luxury residence of eighteen apartments. The inclined elevator takes its passengers to the private beach quickly and easily.

Technical 

Specifications

Longueur

Length

63 m

Incline

33°

Date

Speed

1,6 m/s

Number of people per carrier

6

nombre de stations

Number of stations

2

POMA, l’innovation

au service du projet

Montée et Descente

Le télésiège de la Repose est exploité à la montée depuis le front de neige mais peut aussi embarquer des passagers à la descente lorsque les pistes de retour station sont fermées ou que l’enneigement est insuffisant.

 

Facilité d’embarquement

 

 

Le télésiège de la Repose dessert un important secteur débutants réputées pour ses pistes faciles ; sa facilité d’embarquement séduit les skieurs les plus inexpérimentés.

Téléski

En 2013  POMA a aussi réalisés le téléski des Mélèzes, accessible depuis le plateau de la Repose, contribuant ainsi à développer le secteur de la Repose.

Faible impact visuel

La nouvelle couverture basse en bois a permis d’améliorer grandement l’intégration de la gare dans le paysage de la station.

Confort des sièges

 

Le télésiège de la Repose est équipé de sièges 4 places avec repose-pieds individuels sur les garde-corps et de bacs à l’arrière des sièges pour stocker skis et planche de snowboard lorsque le télésiège est exploité à la descente.

More

POMA Special Projects

View all

Adrianopolis

Brazil – Adrianópolis – 2020

Each day, limestone was transported to the cement plant of Secil Supremo Cimentos by hundreds of trucks, with a huge environmental impact: gas emissions, damage to the road, material spills. The loads are now carried via a FlyingBelt®, a transport solution with a very low environmental impact that is perfectly adapted to topographic constraints.

Read

Apiaï

Brazil – State of São Paulo – 2013

Equipped with 290 buckets, this 10-kilometre-long rope line transports 9,000 tonnes of limestone daily to the cement plant of the city of Apiai, in the state of São Paulo. This quiet, eco-friendly solution helps preserve the natural site.

Read

France – Nice – 2014

Maeterlinck Palace Inclined Elevator

The Maeterlinck Palace is a former luxury hotel overlooking the Bay of Angels in Nice. In 2014, it was equipped with an inclined elevator to allow its residents to easily reach the beach.

product range
Funicular
Application
Scientific purpose
More About

The Project

The Maeterlinck Palace, bought up in June 2012, has been transformed into a luxury residence of eighteen apartments. The inclined elevator takes its passengers to the private beach quickly and easily.

Télémix® Les Jeux

in motion

Technical 

Specifications

Longueur

Length

63 m

Incline

33°

Date

Speed

1,6 m/s

Number of people per carrier

6

nombre de stations

Number of stations

2

POMA, l’innovation

au service du projet

Montée et Descente

Le télésiège de la Repose est exploité à la montée depuis le front de neige mais peut aussi embarquer des passagers à la descente lorsque les pistes de retour station sont fermées ou que l’enneigement est insuffisant.

 

Facilité d’embarquement

 

 

Le télésiège de la Repose dessert un important secteur débutants réputées pour ses pistes faciles ; sa facilité d’embarquement séduit les skieurs les plus inexpérimentés.

Téléski

En 2013  POMA a aussi réalisés le téléski des Mélèzes, accessible depuis le plateau de la Repose, contribuant ainsi à développer le secteur de la Repose.

Faible impact visuel

La nouvelle couverture basse en bois a permis d’améliorer grandement l’intégration de la gare dans le paysage de la station.

Confort des sièges

 

Le télésiège de la Repose est équipé de sièges 4 places avec repose-pieds individuels sur les garde-corps et de bacs à l’arrière des sièges pour stocker skis et planche de snowboard lorsque le télésiège est exploité à la descente.

Maeterlinck Palace in pictures

More

POMA Special Projects

View all

Fourvière

France – Lyon – 2018

POMA carried out the special inspection of the iconic funicular railway in Lyon. During the inspection, its carriers as well as the drive station were completely renovated and upgraded in SIGMA’s workshops, according to the SYTRAL guidelines aimed at “providing users with an even greater level of comfort, while preserving the line’s historic heritage”.

Read

Hong Kong Wheel

China – Hong Kong – 2014

POMA produced the 45 cabins for the Hong Kong observation wheel in China. The observation wheel offers spectacular views over the bay and megacity centre, both during the day and at night.

Read

Ain Dubai

United Arab Emirates – Dubai – 2020

For the world’s largest observation wheel, commissioned for the Dubai World Expo, POMA built 48 outsized capsules, the largest and heaviest ever produced. The teams came up with evermore ingenious product development solutions and met a very high level of customer demand.

Read

i360

England – Brighton – 2016

POMA designed and manufactured the entire pod and drive system of the world’s tallest observation tower, known as the British Airways i360. A unique concept, located on the Brighton seafront in the south of England.

Read

Shenzhen Observation Wheel

China – Shenzhen – 2020

POMA produced the 28 capsules of the observation wheel for the Chinese megalopolis of Shenzhen. Developed specifically to withstand a very hot and humid climate, they presented a real technical challenge, which the group’s teams managed to overcome.

Read

Miami Airport

United States – Miami – 2016

Miami International Airport inaugurated its two APMs in 2016 and 2017. The two APM trains travel 375 m and carry up to 12,000 passengers per hour between the main terminal and terminal E.

Read

Cairo Airport

Egypt – Cairo – 2012

The expanding Cairo International Airport, one of the largest in the Middle East, wanted a high-performance link to connect its three airport terminals and to provide access to the car parks and shopping centre. The specifications for the construction of the MiniMetro® were speed, silence, comfort, availability and also environmental considerations.

Read

London Eye

England – London – 2000

Right in the heart of London, on the banks of the River Thames, 32 rotating capsules climb to 135 m, taking visitors above the rooftops of London for an exceptional view of the entire capital.

Read

The High Roller

United states – Las Vegas – 2014

Caesars Entertainment has entrusted the POMA Group with the design and manufacture of the High Roller observation wheel capsules. A flagship attraction of “The Linq”, a new urban and entertainment district in Las Vegas.

Read

France – Nice – 2014

Maeterlinck Palace Inclined Elevator

The Maeterlinck Palace is a former luxury hotel overlooking the Bay of Angels in Nice. In 2014, it was equipped with an inclined elevator to allow its residents to easily reach the beach.

product range
Quadran
Application
Repowering
More About

The Project

The Maeterlinck Palace, bought up in June 2012, has been transformed into a luxury residence of eighteen apartments. The inclined elevator takes its passengers to the private beach quickly and easily.

Discover

Quadran

Technical 

Specifications

Longueur

Length

63 m

Incline

33°

Date

Speed

1,6 m/s

Number of people per carrier

6

nombre de stations

Number of stations

2

POMA, l’innovation

au service du projet

Montée et Descente

Le télésiège de la Repose est exploité à la montée depuis le front de neige mais peut aussi embarquer des passagers à la descente lorsque les pistes de retour station sont fermées ou que l’enneigement est insuffisant.

 

Facilité d’embarquement

 

 

Le télésiège de la Repose dessert un important secteur débutants réputées pour ses pistes faciles ; sa facilité d’embarquement séduit les skieurs les plus inexpérimentés.

Téléski

En 2013  POMA a aussi réalisés le téléski des Mélèzes, accessible depuis le plateau de la Repose, contribuant ainsi à développer le secteur de la Repose.

Faible impact visuel

La nouvelle couverture basse en bois a permis d’améliorer grandement l’intégration de la gare dans le paysage de la station.

Confort des sièges

 

Le télésiège de la Repose est équipé de sièges 4 places avec repose-pieds individuels sur les garde-corps et de bacs à l’arrière des sièges pour stocker skis et planche de snowboard lorsque le télésiège est exploité à la descente.

Ils en parlent

Quadran

This new project, led by QUADRAN and POMA-Leitwind, strengthens the energy self-sufficiency potential of the Overseas Territories. It demonstrates the relevance of replacing renewable energy equipment as a lever for efficient and rapid action through the operation of a wind farm. It confirms the choice of a virtuous industrial model based on the manufacture of wind turbines assembled in France

Head of Business Development at POMA LEITWIND

Denis Baud-Lavigne
More

POMA Special Projects

View all