Blondin
![Blondins POMA](https://www.poma.net/wp-content/uploads/2020/06/blondin-32x25.jpg)
for equipment
The strengths
of the product
L’expertise au service de nos solutions
All our references
of cable cranes
Discover our other solutions
for the transport of materialsBlondin
![Blondins POMA](https://www.poma.net/wp-content/uploads/2020/06/blondin-32x25.jpg)
for equipment
The strengths
of the product
L’expertise au service de nos solutions
All our references
of cable cranes
DISCOVER OUR OTHER solutions
for the transport of materialsBlondin
![Blondins POMA](https://www.poma.net/wp-content/uploads/2020/06/blondin-32x25.jpg)
for equipment
The strengths
of the product
L’expertise au service de nos solutions
All our references
of Material Ropeways
Apiaï
Brazil – State of São Paulo – 2013
Equipped with 290 buckets, this 10-kilometre-long rope line transports 9,000 tonnes of limestone daily to the cement plant of the city of Apiai, in the state of São Paulo. This quiet, eco-friendly solution helps preserve the natural site.
ReadVicat
France – Saint-Egrève – 1987
The industrial ropeway, which is almost 2 km long, transports materials, crossing the Isère, a 6-lane motorway and with a significant difference in elevation on the slopes of the Vercors Massif to the cement works of Saint-Egrève.
ReadDISCOVER OUR OTHER Solutions
for the transport of materialsBlondin
![Blondins POMA](https://www.poma.net/wp-content/uploads/2020/06/blondin-32x25.jpg)
for equipment
The strengths
of the product
L’expertise au service de nos solutions
All our references
of cable cranes
Adrianopolis
Brazil – Adrianópolis – 2020
Each day, limestone was transported to the cement plant of Secil Supremo Cimentos by hundreds of trucks, with a huge environmental impact: gas emissions, damage to the road, material spills. The loads are now carried via a FlyingBelt®, a transport solution with a very low environmental impact that is perfectly adapted to topographic constraints.
Read